ep

January 18, 2021

Common Description
Equipped together with the zero leak bidirectional checking sole-noid valves, this energy unit is made for that operation of two independent circuits. Which are respectively to the major and subordinate platforms of your double scissors lift. Two cut-off valves are applied for reducing the machine manually in situation of power loss. If additional independent circuits are demanded for your application please speak to us for availability.
Remark: 1. Please check with our sales engineer to the different pump displacement, motor energy or tank capability.
two. CSA or UL licensed motors can be found upon request.
Exclusive Notes
one. The AC motor is of S3 duty cycle, which can only work intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean each of the hydraulic parts concerned in advance of installation of the power unit.
three. Viscosity on the oil shoud be 15~46 cst,and the oil should be clean and absolutely free of impurities,N46 hydraulic oil is proposed.
4. The energy unit ought to be mounted vertically.
five. Check the oil degree from the tank immediately after the original operating on the electrical power unit.
6. Oil shifting is needed just after the first a hundred operation hrs,afterwards once every single 3000 hours.